A5: EXCEPTION CENTERShortage Radar & Schedule Risk Mitigation

Operational Exceptions & Shortage Triage

Identify, owner-assign, and resolve capacity shortages, schedule risks, and labor constraints before project milestone impact.

Linear Plan Statistical Engine · Risk & Slippage Radar·1 Unresolved Shortage Gap (3 HVAC Technicians)

Terminal 2 Ducting Shortage · Milestone Slippage Trajectory

Resolution Trajectory:Phased Split (5 + 3) Safe
Client Requested

8 HVAC Techs

REQ-2026-1049 · Al Laith
Tranche 1 Immediate

5 Technicians

Dec 01 mobilization locked
Shortage Deficit

3 Technicians

Dec 08 backfill tranche
Schedule Slippage

0 Days Net

Saved from +7d penalty
Incident Triage & Resolution TreeActive Mitigation
REQ-1049 (Al Laith)8 Req
◊ MCT-T2 Ducting· Dec 01
◊Tranche 1 Mobilization5 Techs · Dec 01

Prevents critical path shutdown on ducting headers

◊Tranche 2 Backfill3 Techs · Dec 08

Released from Sohar phase completion without penalty

Milestone Slippage vs. Mitigation Envelope
Contract Scope (8 Techs)
Mitigated S-Curve
Unmitigated Delay
Penalty Cutoff
◊◊◊Dec 01 Tranche 1 (5)Dec 08 Backfill (3)Target CompleteDec 15 Penalty Line+7d Delay
EXC-HVAC-003·Category: CAPACITY SHORTAGE

Critical 3-worker shortage for Muscat Airport Terminal 2 duct installation

CRITICAL SEVERITYOPEN
Operational Impact Analysis

Client requested 8 technicians; only 5 deployable. Potential 5-day slippage on Milestone M3 (Chilled Water Piping).

Calculated Shortage Gap: 3 HVAC Technician
Active Mitigation Plan

Propose staggered deployment: 5 technicians on 2026-12-01 + 3 technicians on 2026-12-08 from Duqm demobilization.

Owner: Rashid Al-HarthyTarget Date: 2026-11-23
Linked Request: REQ-2026-1049 · Project: Muscat Airport Terminal 2 Fit-Out
EXC-PIPE-001·Category: CAPACITY SHORTAGE

Sohar site requested 2 additional pipe fitters; pool currently near 100% capacity

MEDIUM SEVERITYIN_REVIEW
Operational Impact Analysis

No immediate project delay; minor schedule buffer compressed.

Calculated Shortage Gap: 1 High-Pressure Pipe Fitter
Active Mitigation Plan

Roster review scheduled with Galfar contractor.

Owner: Amur Al-HadhramiTarget Date: 2026-11-28
Linked Request: REQ-2026-1049 · Project: Muscat Airport