Operations Portfolio Health
Real-time multi-site workforce governance, deployable trade capacity, and active subcontractor commitments for Al Laith and regional partners.
Muscat Airport & Sohar Freezone
40 deployed · 36 in pool
3 HVAC Techs Shortage (Al Laith)
Optimal operational bandwidth
Muscat Airport Terminal 2 — Milestone Delivery Trajectory
Immediate dispatch to MCT-T2 concourse ducting grid C-14.
Transitioning from Sohar Port phase handoff to backfill shortage.
Trade Pool Capacity & Reservation Barometer
Deterministic allocation balance: Total Pool (76) − Actively Committed (40) = Deployable Reserve (36).
| Technical Trade | Active Site Allocations | Committed | Free Reserve | Total Pool | Deployment Ratio | Status |
|---|---|---|---|---|---|---|
HVAC Technician HVAC_TECH | Muscat Airport (Terminal 2 Ducting) | 5 | 5 | 10 | 50% Committed | Limited (3-5) |
Certified Scaffolder SCAFFOLDER | Muscat Airport & Sohar Freezone | 10 | 14 | 24 | 42% Committed | Available (10+) |
Industrial Electrician ELEC_TECH | Sohar Cold Storage Package | 12 | 4 | 16 | 75% Committed | Limited (3-5) |
High-Pressure Pipe Fitter PIPE_FITTER | Sohar Industrial Port Terminal | 7 | 1 | 8 | 88% Committed | Constrained (<2) |
Structural Steel Erector STEEL_ERECTOR | Muscat Airport Concourse C | 6 | 12 | 18 | 33% Committed | Available (10+) |
Daily Supervisor Field Reports
Foreman Khalfan Al-Farsi confirmed 42/42 assigned technical crew present. MEP ducting installation on Concourse Grid C-14 active. Third-party scaffold load inspection passed with zero safety violations.
Lead Electrical Supervisor Mazin Al-Hinai reported 12/12 crew deployed. Hot work permits co-signed by Sohar Port Authority. Cable pulling on main electrical switchgear stands at 65% milestone progress.
Contractual Project Milestones
Al Laith Building Cont. (Oman) · Seeb, Muscat Governorate, Oman
42 deployed
Al Laith Building Cont. (Oman) · Sohar Port & Freezone, Al Batinah North
26 deployed